Skip to content
DreamSheets
Menu
More in Kit · 4

Kit costs and the Kit PDF and Excel

Totals per location and for the show, and what the kit documents contain.

Kit costs and the Kit costs PDF and Excel need Financials at View or above. Without it, Kit shows where kit is and when, and its Download gives the allocation only.

Totals on the Kit tab

  • The Kit costs strip at the top gives the show's To date and Committed. Committed is every kit to its date out, with its fixed costs.
    The Kit costs strip: To date £38,910.00 and Committed £66,160.00.
  • On View: Table, each parent location ends with a subtotal row (KING'S WHARF · all 6 items), and the last row is the Total for every kit on the show. The subtotals and total cover the whole show, not only the rows on screen.
  • On Flow, each bar carries a cost chip with its total and weeks, such as £4,200 · 7w.
  • To hide the chips and the strip, open Show ▾ and switch off Costs. Returned kit in the same menu brings back kit that has gone back, muted.

Kit is grouped by the parent location it is at, or was at last, or arrives at first. Kit with no bar is grouped under Unplaced, at the end.

Download

  1. On Kit, click Download ▾, then Choose kit, then PDF or Excel…. Tick the kits to include; All and None tick or clear the list.
    The Download kit allocation or costs dialog: a ticked list of kits and the buttons Kit costs (Excel), Kit costs (PDF), Allocation (Excel) and Allocation (PDF).
  2. Click the document you want. If you can issue a revision, DreamSheets asks first whether to keep the current one or issue the next.
DocumentWhat it holds
Allocation (PDF), Allocation (Excel)One section per kit: each place it sits in the window on screen, then a day-by-day list of where it is. On the Flow only, and 24 kits at most in one download.
Kit costs (PDF), Kit costs (Excel)Totals per parent location, then every chosen kit with its dates, rate, units, charge, fixed costs, total, to date, PO, PO total, supplier, account code, approval, status and notes. It covers the kits' whole runs, whatever the window.

On View: Table the dialog offers the Kit costs documents only, because the Table has no date window. The allocation PDF is A4 landscape and the Kit costs PDF A3 landscape; both carry the revision and the date they were made.

Page 1 of the Kit costs PDF: the totals by parent location, then the first group's kit with dates, costs and purchase details.