Someone tells you they've changed the schedule and your screen still shows the old version. Work down this list; most of the time it is the first or second check.
- Look at the Live indicator in the top bar.
- Green Live: you are connected and the change should already be there. Go to the next check.
- Amber and blinking: DreamSheets is reconnecting. Give it half a minute; it fetches everything you missed when it is back.
- Red Offline: reload the page.
- Make sure you are on the week or window they changed. On Calendar, type the date in the date box and click Go, or click Today. On Labour, Flow and Kit, check the window.
- Check what you've hidden. On Calendar, open Units ▾ and Teams ▾: a unit or team set to Hide, No crew or Collapse won't show its change. Set All to Show. If Core is on in the crew pool, anyone who isn't core crew is faded. On Kit, check Show ▾ and Items ▾.
- If you cover some departments only, changes to another department's teams and crew may be hidden from you. Your departments are named in the top bar, beside the production's title. Ask the owner if you need to see more (Departments).
- Reload the page once. If the change still isn't there, it may not have saved on their side: ask them to look at their screen.
If it is still wrong
Tell your production office, or DreamSheets, which page and which date you were looking at, which team or unit, what you expected to see and what you saw, with a screenshot. Never send a password.