Financials is the labour cost the schedule adds up to, worked out from every booking each time you open it. How the projected labour cost is worked out has the sums.
Narrow what it counts
- Set a Date range, or leave it on the whole production.
- Under Count which days, choose all booked days, days marked shooting only, or non-shoot days only. Rate band picks days on the rig rate, the shoot rate, or both.
- Under Scope, tick Billable roles only to leave out roles kept off Financials. Include unfilled slots starts ticked, so the open slots are costed; untick it to leave them out.
- Pick any Roles, Teams, Departments, Units or Day flags. Nothing picked means all of them. A retired team or an inactive unit with days is still listed, marked retired or inactive, because its days still count.
- Click Apply filters. Reset clears them. Showing at the top says what is counted.
Read it
- The figures: Total cost, Person-days, Crew, Average day, Average week and Day-flag uplift.
- The chart: each week's cost as a bar (base day rate and day-flag uplift), with the spend so far as a line. The peak week is named above it.
- Week by week, under the chart: a row for each week. Click a week to open its roles under it.
- Cost by role and Cost by team, then the tables by role, by team and by unit. Extras / Dailies are bookings with no team; Unassigned are bookings with no unit.