Skip to content
DreamSheets
Menu
More in Getting started · 3

Set up a new production

Create the production, then add roles, departments, teams, units, locations and crew.

A new production starts with six jobs (RIG, SWING, BUILD, PRE-LIGHT, SHOOT and DE-RIG) and one day flag, OT Overtime. Add the rest in this order: the calendar needs teams and crew before you can book anyone.

Create the production

  1. Go to Productions (click the DreamSheets logo, top left) and click New production.
  2. Type the Title. Shoot start date is the day the Dashboard starts calling the job shoot phase, and the date Events prints as "Shoot from". Left blank, it is today.
  3. To start with another show's roles, crew and locations, choose it under Copy catalogue. Leave it on Start empty otherwise. A person's role comes from their contract and daily periods, so crew copied without Engagements have no role until you add their periods.
  4. Click Create production. The Dashboard opens with a Set up this production list that ticks off each step below as you do it.
The New production panel: Title, Shoot start date (optional) with its hint, and Copy catalogue with From production on Start empty (starter jobs only).

Add the lists

  1. Open Lists › Roles. For each role, type the Code and Full name, the rig rate and hours and the shoot rate and hours, then click Add. The code is what shows on every crew card.
  2. Go back to Productions and click Manage beside the show, then Departments (Manage production › Departments). Add each department (Electrical, Rigging, Grip) with Add.
  3. On the same page, add each team under Teams: a name, a colour and its department. In the Roles list below, choose each role's department; the change saves as you pick it.
  4. Open Lists › Units. Add each unit with a name and a Flow code: code 2 labels that unit S2 and PL2 on Flow.
  5. Open Lists › Locations. Add each stage or site with Add location, then the sets inside it with Add set on the row beneath.
  6. Open Lists › Crew and click + Add crew member. Fill in the name and department and the dates they are on the production, choose their contract or daily period and its role under Contract, then click Save. The period's role is the role they work on its days; add later periods with Manage on their row.
Manage production, Departments: Lighting, Rigging, Camera and Grip with their crew, team, role, kit, note, member and invite counts, and the New department row with Add.

Make the first booking

Open Calendar, click + Team at the left of a week and pick a team, then drag someone from the crew pool onto one of its days. Book crew onto a day has the detail.