Skip to content
DreamSheets
Menu
More in Schedules and paperwork · 8

Read and edit Flow

Each location over time: which teams are there and what they are doing.

Flow shows your locations down the side and the days across: which teams are at each set, and what they are doing. It reads the team locations and jobs on the calendar, and what you change on Flow changes them there.

  • Under BARS, Activity colours each bar by its job and Teams by the team. Unit shoot and pre-light days show as S1, PL1 and so on, from each unit's Flow code.
  • Choose how many weeks you see under WINDOW, and move along with ‹, Today and ›.
  • Use Sort to order the locations as Kit does: by stage and set (Set / location), by the first day a unit shoots or pre-lights there (First shoot), by name (Name A to Z) or by scene (Scene). Show unused adds the ones with nothing on.
  • The job colours and the shortcuts are under Key ▾.
Flow in Activity from 12 Oct: Unit Base, Stage 4, Stage 2, King's Wharf, Mill Lane, Ashdown Estate and Camden Depot with their sets, and bars for RIG, PREP, BUILD, PL, S1 and S2.

Open a bar's week on the calendar

Right-click a team's bar and choose Open in calendar. The calendar opens on that week, with the team's row in view and marked for a moment. Where a bar does not show its teams one by one (a unit's shoot day, for example), every team on it is marked. If you have hidden the team on the calendar, it stays hidden and a message says to show it from Teams ▾. Use the browser's Back button to return to Flow where you left it.

Change it

  • Right-click an empty day at a set and choose a team under Place team, with the number of Days and the Job.
  • Right-click a bar for Change job for this block…, Change job from this day…, Place team…, Change team… or Remove from these days. On a tablet, hold your finger still on the bar for half a second instead of right-clicking.
  • With several blocks selected, right-click one of them: Change job for 3 blocks… (the number is how many you picked) and Remove from these days act on all of them. Every team you edit on each block takes the job.
  • Change team… puts another team on the bar for the same days, with the bar's scenes. Crew stay on their team: move people on the calendar.
  • Drag a bar to move it. Wherever you pick it up, its first day lands on the day you drop it on, and the outline shows where it will go before you let go.
  • Drag a bar's end to make it longer or shorter. The arrow keys extend the selected bar.
  • Hold Ctrl (Option on a Mac) and drag to copy a bar; hold Shift and drag to select several. Delete removes the selection.
  • Undo and Redo take back your changes.
Place team on an empty day: DAYS 1, JOB None ▾, then SPARKS, RIG A, RIG B, GRIP and CAMERA, and Cancel.