Skip to content
DreamSheets
Menu
More in Schedules and paperwork · 8

Read and print Full Fat

The shoot, pre-light and team schedule with the pre-light briefings, day by day.

Full Fat is the pre-light schedule: one line for each unit's pre-light location on each day, with its briefing.

Each line shows the date, the unit, the set, then DOP, Gaffer, Cover, Time, Camera and the note. A line with nothing filled in says No briefing.

Full Fat with Busy on: 12 pre-light lines, each with its date, unit, location and briefing and an Edit button; 2ND UNIT on Mon 26 Oct reads No briefing.

Choose what it shows

Set the dates under WINDOW. Under DAYS, Busy shows only days with a pre-light and All days adds the empty ones. Under ORDER, Spliced runs every unit together by date and Stacked keeps each unit's lines together. Units ▾ shows or hides a unit.

Add or change a pre-light

  1. Click Edit on a line. Edit pre-light opens under it, with the date, the set and the briefing as fields.
  2. Change what you need and click Save, or press Enter. Moving the date or the set moves the location on the unit's PRE-LIGHT line on the calendar too.
  3. Remove pre-light takes the line, and the location, off that day.

Click + Add pre-light above the board to add a new line: the same editor opens there for you to choose the unit, day and set.

Print it

Download ▾ gives PDF (A3 landscape) and Excel, in the order and window on screen.